EXACTLY HOW TO INSTALL A BATH TUB: SET UP AN ACRYLIC TUB AND BATHTUB SURROUND

Exactly How to Install a Bath Tub: Set Up an Acrylic Tub and Bathtub Surround

Exactly How to Install a Bath Tub: Set Up an Acrylic Tub and Bathtub Surround

Blog Article

Course Detail

Are you interested in tips around How to Install a Bathtub: Install an Acrylic Tub and Tub Surround?


Tools You Need to Install a New Bathtub
Mounting a tub isn't exactly brain surgery, however it does require strong plumbing, woodworking, and sometimes, tiling abilities. Replacing an old bath tub with a brand-new one is also a reasonably tough project. If the old bathtub is easily accessible, the job can move easily; if you have to open a wall surface to remove the old bathtub and place the new tub, the job is much harder. In either case, the job is within a home handyman's skills, although you will need a helper to move out the old tub and set in the new one. Make sure you have qualified yourself for the job and are comfortable attempting it. As opposed to working with a contractor to take over a halfway-completed job, it is much better to think about utilizing one prior to you start. Chances are you may need an expert plumber to make tube connections.
This short article will aid you install a brand-new bathtub in your shower room if you have actually already gotten a new tub and also don't require to change the plan of your previous water supply pipelines.
Your tools as well as material list should consist of the following:
  • New Tub

  • Hammer

  • Pipe Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Knife

  • Measuring tape

  • Pipe Caps


  • Removing Old Taps


    If you require to replace old taps with brand-new ones as a part of your setup, then the first thing you need to do is detach the supply of water. After doing so, activate the taps to drain any kind of water staying in the system. The process of removing the existing faucets can be rather troublesome due to the limited accessibility that is typically the case.
    Make use of a basin wrench (crowsfoot spanner) or a tap device to reverse the nut that links the supply pipes to the taps. Have a cloth all set for the staying water that will originate from the pipelines. When the supply pipes have been gotten rid of, make use of the very same device to loosen the nut that holds the taps onto the bath/basin. You will certainly require to stop the single faucets from transforming during this process. When the taps have been removed, the holes in the bath/basin will certainly need to be cleaned up of any type of old sealing compound.
    Before going on to fit the brand-new taps, compare the pipeline links on the old taps to the new taps. If the old faucets are longer than the brand-new taps, then a shank adapter is required for the brand-new faucets to fit.

    Fitting New Taps


    If the tails of the brand-new taps are plastic, then you will need a plastic port to avoid damage to the thread. One end of the connector fits on the plastic tail of the tap and the various other end gives a link to the existing supply pipes.
    If you need to fit a monobloc, then you will require reducing couplers, which connects the 10mm pipe of the monobloc to the typical 15mm supply pipeline.
    Next off, place the faucet in the mounting hole in the bath/basin ensuring that the washing machines remain in area in between the faucet as well as the sink. Protect the tap in place with the producer provided backnut. Once the tap is securely in position, the supply pipelines can be attached to the tails of the faucets. The taps can either be connected by using corrugated copper piping or with normal faucet adapters. The previous type ought to be connected to the tap finishes initially, tightening only by hand. The supply pipes can later on be attached to the various other end. Tighten both ends with a spanner after both ends have been attached.

    Mounting the Tub


    Utilizing the two wood boards under its feet, position the tub in the needed position. The wood boards are practical in uniformly spreading the weight of the bathtub over the location of the boards rather than focusing all the weight onto four little points.
    The following goal is to ensure that the bath tub is leveled all round. This can be attained by inspecting the spirit level and also changing the feet on the bathtub till the level reads degree.
    To set up taps, fit all-time low of the furthest flexible faucet port to the appropriate supply pipeline by making a compression join; after that do the exact same for the other faucet.
    Turn on the water supply and also inspect all joints and brand-new pipework for leaks and also tighten them if required. Load the tub and likewise check the overflow electrical outlet and the regular outlet for leakages.
    Lastly, fix the bathroom paneling as described in the maker's instruction manual. Tiling and also sealing around the tub should wait up until the bathtub has actually been used a minimum of once as this will resolve it into its last position.

    Planning for the Installation


    First of all, the supporting framework provided with the bath needs to be fitted (if required) according to the maker's instructions. Next, fit the faucets or mixer to the bathtub. When fitting the faucet block, it is essential to see to it that if the tap includes a plastic washing machine, it is fitted between the bath and also the taps. On a plastic bath, it is additionally sensible to fit a supporting plate under the faucets unit to avoid pressure on the bathtub.
    Fit the versatile faucet adapters to the bottom of the two taps making use of 2 nuts and olives (in some cases provided with the bathtub). Fit the plug-hole outlet by smearing mastic filler round the sink outlet opening, and afterwards pass the outlet with the hole in the bathroom. Make use of the nut supplied by the producer to fit the plug-hole. Take a look at the plug-hole electrical outlet for an inlet on the side for the overflow pipe.
    Next, fit the end of the versatile overflow pipeline to the overflow electrical outlet. After that, screw the pipe to the overflow face which ought to be fitted inside the bathroom. See to it you use all of the supplied washers.
    Link the catch to the bottom of the waste electrical outlet on the bath tub by winding the thread of the waste outlet with silicone mastic or PTFE tape, and screw on the trap to the outlet. Link all-time low of the overflow tube in a comparable manner.The bathroom need to now be ready to be fitted in its final position.

    Tiling Around the Bathtub


    In the area where the bath satisfies the ceramic tile, it is needed to secure the accompanies a silicone rubber caulking. This is necessary as the installation can relocate sufficient to fracture an inflexible seal, creating the water to pass through the wall surface in between the bath as well as the tiling, resulting in issues with moisture as well as possible leaks to the ceiling listed below.
    You can pick from a range of coloured sealants to blend in your components and also fittings. They are sold in tubes and also cartridges, and also are capable of sealing gaps approximately a size of 3mm (1/8 inch). If you have a larger gap to load, you can load it with twists of soaked paper or soft rope. Keep in mind to always load the bath tub with water before sealing, to permit the motion experienced when the tub remains in usage. The sealant can crack rather early if you do not take into account this activity before sealing.
    Conversely, ceramic coving or quadrant ceramic tiles can be used to border the bath or shower tray. Plastic strips of coving, which are easy to use and also cut to size, are additionally conveniently offered on the market. It is advisable to fit the floor tiles utilizing water-resistant or waterproof glue as well as grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    How to Install a Bathtub

    I came across that piece about Installing A Bathtub when exploring the web. If you appreciated our article kindly do not forget to pass it around. I enjoy reading our article about Tools You Need to Install a New Bathtub .




    Website


    Report this page